Appeal No. 1998-0331 Application No. 08/297,257 machine tool is provided with a system for preloading the spindle carriage bearings 44 so as to insure that the workpieces W are more rigidly held in position during machining operations and insuring more accurate and reproducible machining. See col. 6, ll. 29-35. More particularly, Burka describes the preloading system as including a cam member 100, a roller actuator 104 and a valve 106. During indexing of the spindle carriage 34, the roller 104 rolls along the cam 100 with the valve 106 remaining in the normally closed position, blocking the feed port from a central manifold 24 and venting a hub space S to atmosphere. Just as the spindle carriage 34 approaches the end of the indexing cycle, the roller actuator 104 following the cam 100 is forced to actuate the valve 106. This closes the hub space S to atmosphere and opens it for communication with the central manifold 24. Accordingly, pressurized fluid fills the hub -8-Page: Previous 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NextLast modified: November 3, 2007