Appeal No. 2004-0575 Application 09/206,005 In the “informal request” (Exhibit E), Mr. Craig indicates that he wants to “order 10 prototypes ASAP” pending clarification of the design, and notes that his need is “URGENT.” The “formal request” (Exhibit F) is for 10 banjo assemblies apparently as referenced in Form Rite’s drawing EXP-1964-MS (Exhibit C), and indicates as a purpose “Test and evaluate a prototype cooling circuit bypass valve for use on the E400 transmission.” The “DATE REQUIRED” indicated on the “formal request” is Sept. 14, 1994. In the lower lefthand corner, the “formal request” also indicates an estimated cost of “$700.00 EACH” for the banjo assemblies. In addition, a hand written notation appears on the “formal request” and reads “Customer Charge $700 x 10 PCS. = $7,000.” The § 132 declaration further indicates (page 2) that 12 prototypes were assembled and sent to Ford for evaluation during the week of October 12, 1994. An informal engineering estimate indicating a future unit price of $10.59 and estimated tooling costs of $253,215.00 was sent to Ford on December 21, 1994 (Exhibit H), and on February 7, 1995, a more detailed “piece price estimate” was sent to Mr. Craig at Ford (Exhibit J). 7Page: Previous 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 NextLast modified: November 3, 2007