Appeal 2007-1595 Application 09/751,858 1 Susan S. Baum and Cheryl M. O’Donnell, An Approach to Modeling Labor and 2 Machine Down Time in Semiconductor Fabrication, Proceedings Of The 23rd 3 Conference On Winter Simulation, Phoenix, Arizona, ISBN:0-7803-0181-1, Pp. 4 448 - 54 , 1991 (Baum) 5 Alan Dix and Geoffrey Ellis, Starting Simple – Adding Value to Static 6 Visualisation Through Simple Interaction, Proceedings Of The Working 7 Conference On Advanced Visual Interfaces, L'Aquila, Italy, Pp. 124 - 34 , 1998 8 (Dix) 9 10 We enter a new ground of rejection of claims 1-21 and 27 under 35 U.S.C. 11 § 103(a) as obvious over Baum, Jensen, and Dix. 12 13 ADDITIONAL FINDINGS OF FACT (FF) 14 We make the following additional enumerated findings of fact, which are 15 supported by at least a preponderance of the evidence. 16 Baum 17 11. Baum describes an approach to modeling labor resources, and 18 emphasizes techniques for modeling equipment breakdowns (Baum, 19 p. 448). 20 12. Baum portrays a chart that analyzes machine uptime against the 21 frequency of that uptime (Baum, Fig. 6, p. 452). 22 13. Baum’s analysis regards scheduled and unscheduled downtime and 23 relates the analysis to mean-time-between-failures and mean-time-to- 24 repair (Baum 449). 25 14. Time between failures is the time gap between the events of a machine 26 beginning operation and its subsequent failure. Mean-time-between- 11Page: Previous 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Next
Last modified: September 9, 2013