Oregon Statutes - Chapter 469 - Energy; Conservation Programs; Energy Facilities - Section 469.210 - Submission of plans, specifications and contract terms; preliminary certification.

(1) The Director of the State Department of Energy may require the submission of plans, specifications and contract terms, and after examination thereof, may request corrections and revisions of the plans, specifications and terms.

(2) If the director determines that the proposed acquisition, erection, construction or installation is technically feasible and should operate in accordance with the representations made by the applicant, and is in accordance with the provisions of ORS 469.185 to 469.225 and any applicable rules or standards adopted by the director, the director shall issue a preliminary certificate approving the acquisition, erection, construction or installation of the facility. If the director determines that the acquisition, erection, construction or installation does not comply with the provisions of ORS 469.185 to 469.225 and applicable rules and standards, the director shall issue an order denying certification. [1979 c.512 §7; 1995 c.746 §17; 1997 c.656 §8; 1999 c.365 §3; 2001 c.583 §7a; 2003 c.186 §25]

Section:  Previous  469.195  469.197  469.200  469.205  469.206  469.207  469.208  469.210  469.215  469.217  469.220  469.225  469.228  469.229  469.230  Next

Last modified: August 7, 2008