(1) The Director of the State Department of Energy may require the submission of plans, specifications and contract terms, and after examination thereof, may request corrections and revisions of the plans, specifications and terms.
(2) If the director determines that the proposed acquisition, erection, construction or installation is technically feasible and should operate in accordance with the representations made by the applicant, and is in accordance with the provisions of ORS 469.185 to 469.225 and any applicable rules or standards adopted by the director, the director shall issue a preliminary certificate approving the acquisition, erection, construction or installation of the facility. If the director determines that the acquisition, erection, construction or installation does not comply with the provisions of ORS 469.185 to 469.225 and applicable rules and standards, the director shall issue an order denying certification. [1979 c.512 §7; 1995 c.746 §17; 1997 c.656 §8; 1999 c.365 §3; 2001 c.583 §7a; 2003 c.186 §25]
Section: Previous 469.195 469.197 469.200 469.205 469.206 469.207 469.208 469.210 469.215 469.217 469.220 469.225 469.228 469.229 469.230 NextLast modified: August 7, 2008