(1) At the site of every construction project estimated to cost $1 million or more the employer or owner of such place of employment shall provide toilet facilities and facilities for maintaining personal cleanliness for the use of employees on the construction project. Flush toilets shall be provided and the washing facilities shall consist of warm water, wash basins and soap. A building or a mobile, self-contained unit may be provided for such facilities. The number, types and maintenance of facilities shall conform to minimum standards set by the Director of the Department of Consumer and Business Services.
(2) Subsection (1) of this section does not apply to highway construction or maintenance projects or to electricity, water, sewer or gas transmission facility construction or maintenance projects.
(3) The director may, by order, exempt or partially exempt, individual or classes of construction projects from the requirements of subsection (1) of this section when conditions are such that compliance is impractical or impossible. [1975 c.751 §2; 1993 c.450 §1]
Section: Previous 654.097 654.100 654.101 654.105 654.110 654.120 654.130 654.150 654.154 654.155 654.160 654.165 654.170 654.172 654.174 NextLast modified: August 7, 2008