-14- F. Contractors and Work Performed On August 4, 1987, Norwest Nebraska hired Hawkins Construction Co. (Hawkins), as general contractor, to perform the remodeling work at the Douglas Street building. On November 30, 1987, Norwest Nebraska hired Waste Environmental Technology (WET) to remove the asbestos-containing materials from the building. Norwest Nebraska also hired ATC Environmental, Inc., to perform on-site air monitoring during all asbestos-abatement activities at the building. WET declared bankruptcy in 1988 and could not complete the project. On December 5, 1988, Norwest Nebraska hired Michael T. Robinson Associates, Inc. (Robinson), to replace WET and complete removal of the asbestos-containing materials from the Douglas Street building. At that time, Norwest Nebraska also replaced ATC Environmental, Inc., with Chart Services, Ltd. The asbestos removal and remodeling were basically performed in 13 phases; each phase involved a defined area of the Douglas Street building. For each phase, the asbestos-removal contractor removed the asbestos-containing materials before the general contractor began remodeling. After setting up a containment area, the asbestos removal contractor physically removed the walls, floors, ceilings, and light fixtures, where necessary, to reach and remove the asbestos-containing materials. Once all the asbestos- containing materials had been removed from an area, the air was tested for airborne-fiber concentration before the containmentPage: Previous 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Next
Last modified: May 25, 2011