- 68 - 9.2 Option C Processing Fee. In addition to the Processing Fee payable pursuant to Section 9.1 above, MedChem [P.R.] shall pay to Alcon [P.R.] an Option C Processing Fee in connection with the processing of Corium to Option C Flour pursuant to this Agreement. The Option C Processing Fee shall be determined in two steps. First, on or before December 31 of each year, Alcon [P.R.] shall determine the Option C Processing Cost of the Option C Flour. The Option C Processing Cost shall be composed of the Option C Standard Cost less the cost of raw materials owned by MedChem [P.R.] and supplied to Alcon [P.R.] for processing and the depreciation on machinery and equipment owned by MedChem [P.R.] and used in the Conversion Process. Option C Standard Cost shall consist of direct labor, direct materials, variable overhead, fixed overhead and quality assurance cost, and is defined in * * * [a referenced schedule]. Option C Standard Cost shall not include costs associated with insurance provided by MedChem [P.R.], freight or other costs which shall be separately billed to MedChem [P.R.] by third parties. Option C Standard Cost also shall not include any direct labor costs incurred by MedChem [P.R.] in connection with the provision of services by MedChem [P.R.] employees at the Humacao Plant. The Option C Processing Cost plus 10% will then be used throughout the year for the purposes of billing MedChem [P.R.] for the quantity of Option C Flour produced each month. The second step in determining the Option C Processing Fee shall take place at the end of each year. At that time, Alcon [P.R.] shall determine any manufacturing and/or processing variances by comparing the Option C Processing Cost for such year with the actual cost and volumes of Option C Flour during such year. If the variances indicate that the cost to Alcon [P.R.] to process the Option C Flour was greater than the Option C Processing Cost, then MedChem [P.R.] shall pay to Alcon [P.R.] an amount of money equal to the total amount of such variance plus 10% within 30 days of MedChem[ P.R.]’s receipt of written notice setting forth the amount of such variance. If the variance indicates that the cost to Alcon [P.R.] was less than the Option C Processing Cost, then MedChem [P.R.] shall receive from Alcon [P.R.] an amount of money equal to the total amount of such variance plus 10% within 30 days of the end of the year. MedChem [P.R.] shall havePage: Previous 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 Next
Last modified: May 25, 2011