George Tsakopoulos and Drousoula Tsakopoulos - Page 6




                                        - 6 -                                         
          disallowed an additional deduction of $184,918 which petitioner             
          claimed on his amended return as part of the abandonment loss on            
          Stockton/Elsie.                                                             
               Respondent also determined that petitioner had $111,229 of             
          cancellation of indebtedness (COD) income from the discharge of             
          indebtedness upon the disposition of the property.  This amount             
          represents the advances from Angelo to petitioner for expenses              
          related to the cleanup.                                                     
          Cirby/Sunrise Shopping Center Roof                                          
               In May 1993, petitioner received a bid from Robert Graham of           
          Gudgel/Yancey Roofing, Inc., for the latter to perform work on              
          the roof of the Cirby/Sunrise Shopping Center (Cirby/Sunrise).              
          The bid proposed the following work:                                        
               Remove the existing roof and haul same from the premises.              
               Prepare the deck for the application of the new roof.                  
               Install a rosin sheet on the wood deck.                                
               Nail two layers of Malarkey Roofing Products #501 SBS                  
               base sheets to plywood deck, each layer embedded with                  
               asphalt.                                                               
               Apply one layer of Malarkey Roofing Products #601                      
               granulated SBS cap sheet in asphalt.                                   
               Nail one layer of Malarkey Roofing Products #502 cap                   
               sheet and one layer of #601 cap sheet to existing                      
               stucco wall.                                                           
               Remove and reinstall existing cap metal.                               
               Replace cant strip as necessary.                                       








Page:  Previous  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  Next

Last modified: May 25, 2011