George Tsakopoulos and Drousoula Tsakopoulos - Page 20




                                       - 20 -                                         
          to its value.  Mr. Cox concluded that the work was “merely                  
          incidental repairs”.                                                        
               Respondent presented Robert Graham from Gudgel/Yancey                  
          Roofing, Inc., the person who supervised the roof work on the               
          Cirby/Sunrise shopping center.  We found Mr. Graham’s testimony             
          to be honest, forthright, and credible.  Mr. Graham testified               
          that the work was a “re-roofing project” in which:                          
               We go to a roofing system that’s old and needs to be                   
               replaced, and we go there and we tear it off.  We                      
               remove the roofing from the existing plywood, and then                 
               by the time everything is torn off, we’ll be looking at                
               old plywood.                                                           
               We replace whatever needs to be replaced in the way of                 
               plywood, and then we go–-start installing our roofing                  
               systems.  * * *                                                        
          Mr. Graham stated that he replaced the entire builtup portion of            
          the roof, but “that is the entire roof”.  Mr. Graham stated that            
          he reviewed the work during its application and on completion               
          with the representative of the roofing system manufacturer                  
          because the new roof is under warranty for 10 years.                        
               After considering the work completed and Mr. Graham’s                  
          credible testimony, we find that petitioner replaced the roof.              
          Additionally, the replacement roof is expected to last 10 years,            
          prolonging the roof’s useful life.  We believe that the                     
          replacement of the builtup portion of the roof was of a                     










Page:  Previous  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  Next