- 28 -
BI No. 569 appears to be a revision of BI No. 934, which
originally authorized $831,000 in 1982. This budget item was
also revised in late 1984 and late 1985.
ER No. 7031 authorized $417,879 to upgrade the fuel transfer
system for Turkey Point Unit 4. This ER was revised in 1989 to
increase the amount authorized by $712,217. The ER includes a
description that states that the modifications were designed by
Stearns Catalytic Corp. (Stearns Catalytic). Effective December
17, 1984, FPL issued a purchase order to Stearns Catalytic,
authorizing $663,975 to provide labor and materials for the
transfer upgrade modification of Turkey Point Units 3 and 4. A
nuclear safety change order was issued to Stearns Catalytic, with
an effective date of December 19, 1985, to reopen, clarify, and
revise the purchase order.
ER No. 4133, approved and processed in 1988, authorized
$200,000 for modification to convert a single cable hoist to a
dual cable hoist, and for the installation of a new hoist load
indicator system for Turkey Point Unit 4.
With respect to the acquisition and installation of the fuel
transfer system, petitioner incurred capitalized costs (tax
Page: Previous 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 NextLast modified: May 25, 2011