FPL Group, Inc. & Subsidiaries - Page 173

                                       - 58 -                                         
          construction contracts with unrelated parties.  “Wrap up” work              
          was within the original design of the SJRPP.                                
               The SJRPP agreement defined the physical facilities to                 
          include:  (1) Two coal-fired electric generating units, along               
          with all of their necessary equipment; (2) a coal handling                  
          system, including coal storage facilities;61 and (3) a                      
          switchyard.62  The same building contains the generators for                
          Units 1 and 2.  Both units use the same coal yard.  The control             
          room houses control panels for both Units 1 and 2.                          



















               61 The SJRPP agreement also stated:  “Currently being                  
          studied is the conceptual design for and feasibility of a                   
          facility to provide for the waterborne delivery and transfer of             
          fuel.”                                                                      
               62 John P. Reid, business manager for the SJRPP, testified             
          that it was always intended that the SJRPP would include two coal           
          fire units.                                                                 