- 58 - construction contracts with unrelated parties. “Wrap up” work was within the original design of the SJRPP. The SJRPP agreement defined the physical facilities to include: (1) Two coal-fired electric generating units, along with all of their necessary equipment; (2) a coal handling system, including coal storage facilities;61 and (3) a switchyard.62 The same building contains the generators for Units 1 and 2. Both units use the same coal yard. The control room houses control panels for both Units 1 and 2. 61 The SJRPP agreement also stated: “Currently being studied is the conceptual design for and feasibility of a facility to provide for the waterborne delivery and transfer of fuel.” 62 John P. Reid, business manager for the SJRPP, testified that it was always intended that the SJRPP would include two coal fire units.Page: Previous 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 Next
Last modified: May 25, 2011