- 48 - increase the LMS from 10,000 to 250,000 load control points and from 15 to 183 substations. According to a summary of exhibits submitted at trial relating to the cost of the LMS equipment purchased from A.B. Chance in 1988, 1989, and 1990, FPL installed transponders with a total cost of $18,061,148, substation equipment with a total cost of $6,044,979, and master station equipment with a total cost of $7,478,426 for a total cost of $31,584,553.53 With respect to the installation of the LMS, petitioner incurred capitalized costs (tax basis) of $362,837, $15,156,624, and $39,351,031 for equipment placed in service in the 1988, 1989, and 1990 taxable years, respectively. F. St. Lucie Backfit Construction St. Lucie Unit 1 was operational in 1976, and St. Lucie Unit 2 was operational in 1983. There are two categories of backfit items: (1) Items that are the part of the plan completed after commercial operation, and (2) items developed after commercial operation, resulting from regulatory requirements or performance problems. 53 Mr. Garcia testified that all the equipment purchased from A.B. Chance was purchased under the same contract. He also testified that as of the day of trial, FPL was still purchasing equipment from A.B. Chance.Page: Previous 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 Next
Last modified: May 25, 2011