          1984/early 1985, FPL revised this BI to increase the overall                
          budgeted amount to $35 million.                                             
               ER No. 7172, referencing BI No. 543, was processed in 1984             
          and approved $10,675,000 to design, fabricate, and install a                
          control room specific simulator for the St. Lucie power plant.              
          This ER was revised in late 1988/early 1989 to increase the                 
          amount approved to $13,150,000 and revised again in 1991 to                 
          increase the amount approved to $14,520,000.  ER No. 8223,                  
          referencing BI No. 543, was processed in 1985, and authorized               
          $375,000 to provide detailed design and engineering necessary to            
          construct the training facility at the St. Lucie nuclear power              
          plant.  FPL revised this ER in 1986 to increase the amount                  
          approved to $5.5 million, and again in 1988 to increase the                 
          amount approved to $7,050,000.  ER No. 7173, referencing BI No.             
          543 and approved in 1984, authorized $10,780,000 to design,                 
          fabricate, and install a control room specific simulator for                
          Turkey Point.  This ER was revised in late 1988/early 1989 to               
          increase the amount approved to $11,550,000.                                
               A 1987 BI No. 103, approved in 1986, budgeted $2,437,000 to            
          “provide the capital additions necessary to equip the                       
          Training/Simulator [at the St. Lucie nuclear power plant] with              
          state of the art tooling, mockups, and equipment.”  ER No. 1817,            
          which references BI No. 103 and was approved in early 1987,                 
          authorized $330,000 to purchase mockup equipment and plant                  