Sec. 2269.360. SELECTION OF DESIGN-BUILD FIRM. The governmental entity shall select a design-build firm using a combination of technical and cost proposals as provided by Section 2269.361.
Added by Acts 2011, 82nd Leg., R.S., Ch. 1129 (H.B. 628), Sec. 2.08, eff. September 1, 2011.
Redesignated from Government Code, Chapter 2267 by Acts 2013, 83rd Leg., R.S., Ch. 161 (S.B. 1093), Sec. 22.001(23), eff. September 1, 2013.
Amended by:
Acts 2013, 83rd Leg., R.S., Ch. 161 (S.B. 1093), Sec. 22.002(15), eff. September 1, 2013.
Section: Previous 2269.353 2269.354 2269.355 2269.356 2269.357 2269.358 2269.359 2269.360 2269.361 2269.3615 2269.362 2269.363 2269.364 2269.365 2269.366 NextLast modified: September 28, 2016