- 25 - cost to build the roads in the subdivision would total $2,123,788.18 Mr. Dallamora's road construction expense also included $150,000 for the removal of ledge, an expense item separately stated in Mr. Avery's report.19 Relying upon Mr. Flint's analysis of the composition of the soil on the Property, Mr. Avery estimated that a separate expense of $370,000 should have been allocated for the removal of ledge.20 We find Mr. Avery's estimate concerning this additional construction cost persuasive; thus, Mr. Dallamora's estimate for ledge removal must be increased to reflect this expense properly. Based upon all the evidence presented, we conclude that the cost to build the roads on the Property, including the cost of removing ledge, would total $2,350,000.21 18Mr. Handverger estimated that road construction would cost $2,200,000. Similarly, Mr. Segel estimated that the expense would total $2,140,000. 19Mr. Avery stated that "Ledge is the 'enemy' of a site developer as it adds to development cost and makes road and building placement more challenging." 20Mr. Avery's road construction estimate without the ledge removal expense was $2,569,842. 21We calculate the road cost as follows: Mr. Dallamora's estimate ($2,123,788), plus an additional amount for ledge removal ($370,000 - 150,000 = 220,000) = 2,343,788 or $2,350,000. We further determine that this amount would be incurred in two phases, 80 percent in the first phase and the remaining 20 (continued...)Page: Previous 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Next
Last modified: May 25, 2011