Jane Crocker, F.K.A. Jane C. Jacobs, et al. - Page 50

                                       - 40 -                                         
               In 1985, the Redevelopment Agency commissioned Design                  
          Professionals, Inc. (Design Professionals), an architectural                
          firm, to develop cost estimates for renovation of the San Jose              
          Fox to bring it to an operating level of quality.  In their                 
          report, entitled “Preliminary Analysis for Renovation of the Fox            
          Theater for the City of San Jose, August 1, 1985", Design                   
          Professionals presented three alternative schemes of development            
          based on variations in the level of projected use for the San               
          Jose Fox.  Each of the 3 schemes was analyzed in terms of                   
          architectural, structural, mechanical, electrical, lighting,                
          theater systems, acoustical, and audiovisual requirements,                  
          including cost estimates for implementation.  Design                        
          Professionals relied on cost estimates provided by several                  
          consultants with the requisite expertise.                                   
               Scheme 1 consisted of cost estimates to renovate the San               
          Jose Fox for use as an assembly hall in conjunction with the new            
          convention center being built across the street from the theater.           
          A new 2-story lobby with a pedestrian bridge to connect the San             
          Jose Fox to the convention center was recommended.  Scheme 2                
          consisted of the improvements recommended in Scheme 1, as well as           
          developing the theater for use as a symphony hall.  Scheme 3                
          proposed to transform the San Jose Fox into a multifunctional               
          facility with capabilities for opera, ballet, and other types of            
          live performances.  Scheme 3 required the construction of added             