- 4 - used on cargo ships at its equipment yard that it used to store equipment and some hardware items. The Construction Cycle A. The Bid During the year at issue, petitioner performed its construction activity in the following manner. Petitioner obtained a set of building plans from a developer and then visited the construction site to evaluate the soil, weather, and traffic conditions, and to ascertain the location of the materials suppliers. Petitioner calculated its bid price by summing its estimates of the cost of the labor and materials required to perform the work plus a margin for profit based upon the cost of the labor, the quantity of materials, and the complexity of the job. The following is a typical bid worksheet prepared by petitioner: Typical Bid Worksheet Ready-mix concrete $547.80 Sand 225.00 Other materials 69.44 Other materials 7.70 Other materials 4.80 Total 854.74 Tax (8.5%) 72.65 Total materials cost 927.39 Plus labor 477.20 Equals 1,404.59 Plus 15% profit 210.69 Total 1,615.28Page: Previous 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Next
Last modified: May 25, 2011