                        the installation, certification of the well                                     
                        construction by the engineer of record, shall be                                
                        submitted to the department for approval.                                       
                        Within 15 days of department approval of the well                               
                        construction and certification, the permittee                                   
                        shall commence sampling of the groundwater                                      
                        monitoring wells by procedures approved based on                                
                        information submitted in A.6.d of the groundwater                               
                        monitoring plan.  Sampling and analysis shall be                                
                        conducted for the parameters approved in Section                                
                        A.6.a of the referenced plan and results of these                               
                        analyses shall be submitted to the department                                   
                        within 30 days of the sampling.                                                 
                        Sampling and analyses of the wells shall be                                     
                        subsequently conducted every 90 days from the date                              
                        of the initial sampling with analytical results                                 
                        submitted to the department within 30 days after                                
                        each sampling.                                                                  
                  We do not think that the TOP for the Port Everglades plant                            
            readily identifies petitioner’s wastewater neutralization system.                           
            Although the TOP provides a specific timetable for completing                               
            the treatment system, it lacks specific details describing the                              
            property required for the treatment system.  The TOP provides                               
            cross-references to other documents that may contain the                                    
            specifications for the treatment system; however, the permit                                
            itself does not attach any of the cross-referenced documents.                               
            Without providing the specifications and amount of property at                              
            issue, the TOP fails to readily identify the wastewater                                     
            neutralization system.  As the relevant language in the TOP for                             
            the Martin plant is virtually identical to the TOP for the Port                             
            Everglades plant, we find that this document also fails to                                  
            identify FPL’s property.                                                                    