- 117 - estimated number of customers the system will serve, and the basic outline of the three phases of the LMS plan; however, these documents do not detail the property needed for the LMS, nor do they provide the amount of property needed for the system. With respect to the request for engineering assistance, petitioner argues that this document “defined ‘the scope of the work that they wanted engineering to perform.’” Specifically, the request for engineering assistance states: Desired Project Considerations: A. Provide PC/M to: 1. Replace ICW thermometers TI 1415 thru TI 1420 inclusive in existing thermowells with ‘K’ type thermocouples. 2. Replace CCW thermometers TI 633 A, B, & C and TI 663 A, B, & C in existing thermowells with ‘K’ type thermocouples. 3. Install permanent wiring from thermocouples installed in #1 & 2 to rotary selector switch. 4. Please provide connections to read the output of the selector switch (Item #3) via: (a) plug, (b) two foot extension cord with ‘K’ plug end, and (c) terminal posts. 5. Locate Items 3 & 4 in weather proof box with door and locate box on east wall of CCW heat exchanger room near the ICW flow meters, so that both temperature and flow can be read at one location 6. Provide and locate portable readout similar to those listed in B.2 below within the weather proof box.[103] B. Considerations: 103 Desired project consideration A.6. is a handwritten entry, whereas all of the other desired project considerations are typewritten.Page: Previous 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 Next
Last modified: May 25, 2011