FPL Group, Inc. & Subsidiaries - Page 29

                                               - 117 -                                                  
            estimated number of customers the system will serve, and the                                
            basic outline of the three phases of the LMS plan; however, these                           
            documents do not detail the property needed for the LMS, nor do                             
            they provide the amount of property needed for the system.                                  
                  With respect to the request for engineering assistance,                               
            petitioner argues that this document “defined ‘the scope of the                             
            work that they wanted engineering to perform.’”  Specifically,                              
            the request for engineering assistance states:                                              
                  Desired Project Considerations:                                                       
                  A.    Provide PC/M to:                                                                
                        1.    Replace ICW thermometers TI 1415 thru TI 1420                             
                              inclusive in existing thermowells with ‘K’                                
                              type thermocouples.                                                       
                        2.    Replace CCW thermometers TI 633 A, B, & C and                             
                              TI 663 A, B, & C in existing thermowells with                             
                              ‘K’ type thermocouples.                                                   
                        3.    Install permanent wiring from thermocouples                               
                              installed in #1 & 2 to rotary selector                                    
                              switch.                                                                   
                        4.    Please provide connections to read the output                             
                              of the selector switch (Item #3) via: (a)                                 
                              plug, (b) two foot extension cord with ‘K’                                
                              plug end, and (c) terminal posts.                                         
                        5.    Locate Items 3 & 4 in weather proof box with                              
                              door and locate box on east wall of CCW heat                              
                              exchanger room near the ICW flow meters, so                               
                              that both temperature and flow can be read at                             
                              one location                                                              
                        6.    Provide and locate portable readout similar                               
                              to those listed in B.2 below within the                                   
                              weather proof box.[103]                                                   
                  B.    Considerations:                                                                 


                  103 Desired project consideration A.6. is a handwritten                               
            entry, whereas all of the other desired project considerations                              
            are typewritten.                                                                            