- 13 -
with respect to that request.
On March 4, 1998, TMC entered into two construction con-
tracts (collectively March 4, 1998 construction contracts) with
Stone Oak Construction. Under one of those contracts, Stone Oak
Construction agreed to perform the following additional work for
TMC with respect to KQC’s land and 1958 school building that TMC
was leasing from KQC: (1) Install child-size cabinets and sinks
in six classrooms; (2) remove existing outdated windows that do
not meet safety codes and replace with insulated safety glass
windows; (3) install 2-inch asphalt over existing eroded parking
lot surface and driveway; (4) enclose and caulk the perimeter of
the foundation of the 1958 school building, using specialized
engineering techniques; (5) enclose the septic tank and trans-
former with a fence built to certain specifications; (6) upgrade
the septic system; and (7) drill a second well. In return for
completing the foregoing work, TMC agreed to pay Stone Oak
Construction $262,000.
Under the second construction contract that TMC entered into
with Stone Oak Construction on March 4, 1998, Stone Oak Construc-
tion agreed to construct a new building (new building) on KQC’s
land that TMC was leasing from KQC. In return for completing the
construction of that building, TMC agreed to pay Stone Oak
Construction $398,000.
On dates in 1998 not disclosed by the record, Stone Oak
Page: Previous 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 NextLast modified: May 25, 2011