Howard J. Kaplan and Brenda L. Kaplan, et al. - Page 13

                                       - 13 -                                         
          with respect to that request.                                               
               On March 4, 1998, TMC entered into two construction con-               
          tracts (collectively March 4, 1998 construction contracts) with             
          Stone Oak Construction.  Under one of those contracts, Stone Oak            
          Construction agreed to perform the following additional work for            
          TMC with respect to KQC’s land and 1958 school building that TMC            
          was leasing from KQC:  (1) Install child-size cabinets and sinks            
          in six classrooms; (2) remove existing outdated windows that do             
          not meet safety codes and replace with insulated safety glass               
          windows; (3) install 2-inch asphalt over existing eroded parking            
          lot surface and driveway; (4) enclose and caulk the perimeter of            
          the foundation of the 1958 school building, using specialized               
          engineering techniques; (5) enclose the septic tank and trans-              
          former with a fence built to certain specifications; (6) upgrade            
          the septic system; and (7) drill a second well.  In return for              
          completing the foregoing work, TMC agreed to pay Stone Oak                  
          Construction $262,000.                                                      
               Under the second construction contract that TMC entered into           
          with Stone Oak Construction on March 4, 1998, Stone Oak Construc-           
          tion agreed to construct a new building (new building) on KQC’s             
          land that TMC was leasing from KQC.  In return for completing the           
          construction of that building, TMC agreed to pay Stone Oak                  
          Construction $398,000.                                                      
               On dates in 1998 not disclosed by the record, Stone Oak                