- 13 - with respect to that request. On March 4, 1998, TMC entered into two construction con- tracts (collectively March 4, 1998 construction contracts) with Stone Oak Construction. Under one of those contracts, Stone Oak Construction agreed to perform the following additional work for TMC with respect to KQC’s land and 1958 school building that TMC was leasing from KQC: (1) Install child-size cabinets and sinks in six classrooms; (2) remove existing outdated windows that do not meet safety codes and replace with insulated safety glass windows; (3) install 2-inch asphalt over existing eroded parking lot surface and driveway; (4) enclose and caulk the perimeter of the foundation of the 1958 school building, using specialized engineering techniques; (5) enclose the septic tank and trans- former with a fence built to certain specifications; (6) upgrade the septic system; and (7) drill a second well. In return for completing the foregoing work, TMC agreed to pay Stone Oak Construction $262,000. Under the second construction contract that TMC entered into with Stone Oak Construction on March 4, 1998, Stone Oak Construc- tion agreed to construct a new building (new building) on KQC’s land that TMC was leasing from KQC. In return for completing the construction of that building, TMC agreed to pay Stone Oak Construction $398,000. On dates in 1998 not disclosed by the record, Stone OakPage: Previous 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Next
Last modified: May 25, 2011