Tibor Guenther Horwath and Christel Horwath - Page 3

                                        - 3 -                                         
          owned.                                                                      
               During the taxable years at issue, petitioner Tibor Guenther           
          Horwath (Mr. Horwath) occasionally provided consulting services             
          as a sole proprietorship known as “Tibor G. Horwath, Consulting”            
          (Tibor Horwath Consulting).                                                 
          Claimed Depreciation Deductions                                             
               On June 24, 1992, TGC entered into contract DASG60-92-C-0069           
          (1992 contract) with the United States Army Strategic Defense               
          Command (SDC).  During the course of the 1992 contract, SDC paid            
          TGC a total of $1,049,117.                                                  
               The 1992 contract provided in pertinent part with respect to           
          the specific tasks to be completed pursuant to that contract:               
               The following specific tasks will be performed under                   
               the proposed program:                                                  
               Phase I:                                                               
                    (1) Design and construct an experimental                          
                         SSPG [small spinning projectile guid-                        
                         ance] seeker and associated laboratory                       
                         setup for open loop performance evalua-                      
                         tion of the concept against computer                         
                         generated and recorded, single and mul-                      
                         tiple target and background images.                          
                    (2) Evaluate the performance of the SSPG                          
                         seeker for various target and background                     
                         conditions, including the presence of                        
                         detector noise.                                              
                    (3) Determine performance limits for the                          
                         SSPG seeker in terms of minimum detect-                      
                         able line of sight motion to the target,                     
                         and its ability to extract target fea-                       
                         ture information.                                            






Page:  Previous  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  Next

Last modified: May 25, 2011