- 5 - for a briefing to the Government. Phase III: (1) Conduct an analysis effort aimed at determining the optimum selection of field test conditions, scaling of param- eters and target representations, and prepare a test plan. (2) Design and construct an experimental guided SSPG test vehicle and launcher to be used in field tests. (3) Repackage and miniaturize the laboratory SSPG seeker and line of sight processor and integrate into the test vehicle, together with thrusters, solenoid valves and cold propellant reservoir. (4) Define specific parameters of the field experiment by using the hardware in the loop simulation model adapted for the characteristics of the experimental test vehicle. (5) Conduct field tests with various targets and test conditions and document and analyze test data. (6) Prepare a final report for the entire effort and put together a briefing for the Government. The 1992 contract provided in pertinent part with respect to certain contract data requirements: CONTRACT DATA REQUIREMENTS LIST * * * * * * * 1) A001 2) Funds & Man-hour Expenditure Report * * * * * * * 16) First report due 15 calendar days after first full accounting period. Submissions will include both thePage: Previous 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Next
Last modified: May 25, 2011