Phase III:
(1) Conduct an analysis effort aimed at
determining the optimum selection of
field test conditions, scaling of param-
eters and target representations, and
prepare a test plan.
(2) Design and construct an experimental
guided SSPG test vehicle and launcher to
be used in field tests.
(3) Repackage and miniaturize the laboratory
SSPG seeker and line of sight processor
and integrate into the test vehicle,
together with thrusters, solenoid valves
and cold propellant reservoir.
(4) Define specific parameters of the field
experiment by using the hardware in the
loop simulation model adapted for the
characteristics of the experimental test
vehicle.
(5) Conduct field tests with various targets
and test conditions and document and
analyze test data.
(6) Prepare a final report for the entire
effort and put together a briefing for
the Government.
The 1992 contract provided in pertinent part with respect to
certain contract data requirements:
CONTRACT DATA REQUIREMENTS LIST
* * * * * * *
1) A001 2) Funds & Man-hour Expenditure Report
* * * * * * *
16) First report due 15 calendar days after first full
accounting period. Submissions will include both the