                         for a briefing to the Government.                            
          Phase III:                                                                  
                    (1) Conduct an analysis effort aimed at                           
                         determining the optimum selection of                         
                         field test conditions, scaling of param-                     
                         eters and target representations, and                        
                         prepare a test plan.                                         
                    (2) Design and construct an experimental                          
                         guided SSPG test vehicle and launcher to                     
                         be used in field tests.                                      
                    (3) Repackage and miniaturize the laboratory                      
                         SSPG seeker and line of sight processor                      
                         and integrate into the test vehicle,                         
                         together with thrusters, solenoid valves                     
                         and cold propellant reservoir.                               
                    (4) Define specific parameters of the field                       
                         experiment by using the hardware in the                      
                         loop simulation model adapted for the                        
                         characteristics of the experimental test                     
                         vehicle.                                                     
                    (5) Conduct field tests with various targets                      
                         and test conditions and document and                         
                         analyze test data.                                           
                    (6) Prepare a final report for the entire                         
                         effort and put together a briefing for                       
                         the Government.                                              
               The 1992 contract provided in pertinent part with respect to           
          certain contract data requirements:                                         
                          CONTRACT DATA REQUIREMENTS LIST                             
                  *       *       *       *       *       *       *                   
               1)  A001  2)  Funds & Man-hour Expenditure Report                      
                  *       *       *       *       *       *       *                   
               16)  First report due 15 calendar days after first full                
               accounting period.  Submissions will include both the                  