- 69 -
to its Rice substation continuing to its Poinsett substation;
(ii) a separate 500-kV transmission line from its Duval
substation to its Poinsett substation; and (iii) a 500-kV
transmission line from its Poinsett substation to its Martin
plant. FPL covenanted to “use [its] best efforts consistent with
Prudent Utility Practices to complete such facilities by the time
such facilities are needed to purchase the increased unit power
capacity on January 1, 1985.” FPL completed each of the
transmission lines required under the amended power agreement by
January 1, 1985. As of September 1985, FPL had developed a
transmission expansion program for the years 1985 through 1990.
A 1983 BI No. 273 budgeted $9,670,000 to construct
approximately 13 miles of 240-kV line from the Corbett substation
to the Ranch substation; extend the Orange River-Ranch 240-kV
line into the Corbett substation; “reconductor” the 240-kV line
from the Cedar substation to the Ranch substation; install two
240-kV terminals for the Corbett lines; and upgrade the Cedar
Page: Previous 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 NextLast modified: May 25, 2011