FPL Group, Inc. & Subsidiaries - Page 191

                                                - 76 -                                                  
                  A 1986 BI No. 330, approved in 1985, budgeted $1.2 million                            
            to construct a 230-23-kV one-transformer two-feeder distribution                            
            substation.84  The BI states:                                                               
                  The City of Port St. Lucie has experienced an estimated                               
                  67% increase in population from 1980 to 1983.  * * *                                  
                  Economic studies have indicated that the addition of                                  
                  Turnpike Substation with its two feeders connected to                                 
                  the proposed Midway-Sandpiper 230 kV line is the most                                 
                  cost effective method of addressing this load growth.                                 
            ER No. 8476, which references BI No. 330 and was approved in                                
            early 1985, authorized the expenditure of $1,856,836 to construct                           
            the Turnpike substation.                                                                    
                  A 1988 BI No. 206, approved in 1987, budgeted $2.3 million                            
            as a conceptual estimate to construct approximately 7.7 miles of                            
            single pole concrete 230-kV line from the Turnpike substation to                            
            the proposed Crane substation.  The stated reason for budgeting                             
            this amount was:                                                                            
                        The area adjacent to Palm City and Martin Downs is                              
                  presently being subjected to expansive residential,                                   
                  commercial, and industrial development. * * *                                         
                            *     *     *     *     *     *     *                                       
                        * * * It is proposed to construct Crane Substation                              
                  and the associated Crane-Turnpike 230 kV line to                                      
                  address the expected load growth and service                                          
                  reliability to the area.                                                              
                        This line extension will be utilized in the                                     
                  development of the Turnpike-Crane-Bridge-Plumosus                                     
                  future circuit.                                                                       


                  84 Mr. Sanders testified that BI No. 330 was to build the                             
            Turnpike substation.                                                                        