- 76 - A 1986 BI No. 330, approved in 1985, budgeted $1.2 million to construct a 230-23-kV one-transformer two-feeder distribution substation.84 The BI states: The City of Port St. Lucie has experienced an estimated 67% increase in population from 1980 to 1983. * * * Economic studies have indicated that the addition of Turnpike Substation with its two feeders connected to the proposed Midway-Sandpiper 230 kV line is the most cost effective method of addressing this load growth. ER No. 8476, which references BI No. 330 and was approved in early 1985, authorized the expenditure of $1,856,836 to construct the Turnpike substation. A 1988 BI No. 206, approved in 1987, budgeted $2.3 million as a conceptual estimate to construct approximately 7.7 miles of single pole concrete 230-kV line from the Turnpike substation to the proposed Crane substation. The stated reason for budgeting this amount was: The area adjacent to Palm City and Martin Downs is presently being subjected to expansive residential, commercial, and industrial development. * * * * * * * * * * * * * It is proposed to construct Crane Substation and the associated Crane-Turnpike 230 kV line to address the expected load growth and service reliability to the area. This line extension will be utilized in the development of the Turnpike-Crane-Bridge-Plumosus future circuit. 84 Mr. Sanders testified that BI No. 330 was to build the Turnpike substation.Page: Previous 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 Next
Last modified: May 25, 2011