- 71 -
in 1986, authorized the expenditure of $15,294,000 to “Construct
33 miles of 500 KV transmission line from proposed Corbett
Substation to Martin Plant.”78
ER No. 1224, approved in 1986, authorized $16,599,430 to
construct the Corbett substation, a “500/230 kV air insulated
substation”. ER No. 1249, approved in 1986, authorized the
expenditure of $4,412,159 to construct approximately 11 miles of
double circuit 230-kV transmission line.79 ER No. 2383, approved
in 1987, authorized the expenditure of $896,375 to construct
approximately 2.5 miles of double circuit 230-kV transmission
line looping the Orange River-Ranch 230-kV line into the Corbett
substation. ER No. 1984, approved in 1987, authorized the
expenditure of $113,550 to, inter alia, “Convert the Ranch No. 2,
230kV line to Corbett 230kV line.” ER No. 1479, approved in
1986, authorized the expenditure of $94,840 for the Orange River
subrelaying equipment for the Corbett 230-kV line. ER No. 1778,
approved in early 1987, authorized the expenditure of $593,620 to
upgrade a portion of the “230 kV yard at Ranch Substation * * *
to accommodate the Corbett No. 1 and No. 2, 230 kV lines.”
78 Mr. Sanders testified that this expenditure requisition
was approved in 1986, and construction began after such approval.
He also testified that FPL started receiving power under the
Southern company contracts before the construction of the
property.
79 Mr. Sanders testified that the Southern company contracts
did not specifically identify the property listed in ER No. 1249.
Page: Previous 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 NextLast modified: May 25, 2011