- 77 - ER No. 5366, which referenced BI No. 206 and was processed in late 1988/early 1989, authorized the expenditure of $2,226,922 to construct approximately 7.7 miles of 230-kV single circuit transmission line from the existing Turnpike substation to the proposed Crane substation. The ER explained that the “ER will provide service for the expected load growth and improve service reliability to the area.” A 1988 BI No. 307, approved in 1987, budgeted $1,530,000 to construct the Crane substation, which consists of a 230-23-kV line, one transformer, and a two feeder distribution substation. FPL approved this BI because “The area adjacent to Palm City and Martin Downs is presently being subjected to expansive residential, commercial, and industrial development.” ER No. 4512, approved in 1988, authorized the expenditure of $111,245 to install a third regulated feeder position to the Turnpike substation. The ER anticipated that construction would begin on March 1, 1989. ER No. 5056, approved in late 1988/early 1989, authorized the expenditure of $240,928 to add a third 230- kV line terminal to the Turnpike substation. The ER stated that “The present 138kV network * * * will become inadequate to serve load in 1989.” A 1986 BI No. 246, approved in 1985, budgeted $5,860,000 for a conceptual estimate to construct approximately 16 miles of single pole concrete 230-kV line from the Andytown substation toPage: Previous 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 Next
Last modified: May 25, 2011