                  ER No. 5366, which referenced BI No. 206 and was processed                            
            in late 1988/early 1989, authorized the expenditure of $2,226,922                           
            to construct approximately 7.7 miles of 230-kV single circuit                               
            transmission line from the existing Turnpike substation to the                              
            proposed Crane substation.  The ER explained that the “ER will                              
            provide service for the expected load growth and improve service                            
            reliability to the area.”                                                                   
                  A 1988 BI No. 307, approved in 1987, budgeted $1,530,000 to                           
            construct the Crane substation, which consists of a 230-23-kV                               
            line, one transformer, and a two feeder distribution substation.                            
            FPL approved this BI because “The area adjacent to Palm City and                            
            Martin Downs is presently being subjected to expansive                                      
            residential, commercial, and industrial development.”                                       
                  ER No. 4512, approved in 1988, authorized the expenditure of                          
            $111,245 to install a third regulated feeder position to the                                
            Turnpike substation.  The ER anticipated that construction would                            
            begin on March 1, 1989.  ER No. 5056, approved in late 1988/early                           
            1989, authorized the expenditure of $240,928 to add a third 230-                            
            kV line terminal to the Turnpike substation.  The ER stated that                            
            “The present 138kV network * * * will become inadequate to serve                            
            load in 1989.”                                                                              
                  A 1986 BI No. 246, approved in 1985, budgeted $5,860,000 for                          
            a conceptual estimate to construct approximately 16 miles of                                
            single pole concrete 230-kV line from the Andytown substation to                            