- 79 - to serve new customers in Bona Venture Estates and Arvida’s Weston development”.86 A 1986 BI No. 254, approved in late 1985, budgeted $900,000 to construct approximately 2.5 miles of single circuit, single pole concrete 230-kV transmission line. The BI stated that it was initially authorized for $600,000 in 1984 and that, at that time, the line was under construction. The BI stated that this expenditure was needed because of growth in the area from new development and increased demand for electricity.87 ER No. 1332, which references BI No. 254, authorized the expenditure of $2,265,570 to construct approximately 7.5 miles of single pole concrete 230-kV transmission line from the Hiatus substation to the Melaleuca substation. With respect to the installation of the Midway-Jensen-Crane transmission line system, petitioner incurred capitalized costs (tax basis) of $119,911 and $3,109,573 for equipment placed in service in the 1989 and 1990 taxable years, respectively. With respect to the installation of the Andytown-Lauderdale transmission line, petitioner incurred capitalized costs (tax basis) of $6,436,912, $545,188, and $16,707 for equipment placed 86 Mr. Sanders testified that this BI was for the Melaleuca- Trace section of the Andytown-Lauderdale line. 87 Mr. Sanders testified that “This is another section of the Andytown-Lauderdale number four line, the Hiatus Springtree section.”Page: Previous 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 Next
Last modified: May 25, 2011