FPL Group, Inc. & Subsidiaries - Page 194

                                                - 79 -                                                  
            to serve new customers in Bona Venture Estates and Arvida’s                                 
            Weston development”.86                                                                      
                  A 1986 BI No. 254, approved in late 1985, budgeted $900,000                           
            to construct approximately 2.5 miles of single circuit, single                              
            pole concrete 230-kV transmission line.  The BI stated that it                              
            was initially authorized for $600,000 in 1984 and that, at that                             
            time, the line was under construction.  The BI stated that this                             
            expenditure was needed because of growth in the area from new                               
            development and increased demand for electricity.87  ER No. 1332,                           
            which references BI No. 254, authorized the expenditure of                                  
            $2,265,570 to construct approximately 7.5 miles of single pole                              
            concrete 230-kV transmission line from the Hiatus substation to                             
            the Melaleuca substation.                                                                   
                  With respect to the installation of the Midway-Jensen-Crane                           
            transmission line system, petitioner incurred capitalized costs                             
            (tax basis) of $119,911 and $3,109,573 for equipment placed in                              
            service in the 1989 and 1990 taxable years, respectively.  With                             
            respect to the installation of the Andytown-Lauderdale                                      
            transmission line, petitioner incurred capitalized costs (tax                               
            basis) of $6,436,912, $545,188, and $16,707 for equipment placed                            


                  86 Mr. Sanders testified that this BI was for the Melaleuca-                          
            Trace section of the Andytown-Lauderdale line.                                              
                  87 Mr. Sanders testified that “This is another section of                             
            the Andytown-Lauderdale number four line, the Hiatus Springtree                             
            section.”                                                                                   