- 208 -
Appendix B
DRI Project
The first column is the name of the DRI project. The second
column is the “effective date” of the DRI project. The third
column lists FPL’s work order number (WO) or sometimes, as
referenced, the ER number. The fifth and sixth columns state the
amount and date authorized under the specific WO or ER.141
Name Effective Work Amount Year
Date Order Authorized Authorized
Boynton Beach 5/7/1974 1450 $115,734 1989
Mall
Frenchman’s 10/23/1973 199 $24,933 1988
Creek
200 $65,193 1990
201 $37,187 1990
516 $35,201 1990
517 $19,017 1990
2474 $30,121 1990
2552 $34,064 1990
2885 $16,570 1990
4259 $25,983 1990
7922 $26,355 1987
Grand Harbor 10/23/1985 7568 $37,552 1988
Harbour Ridge 12/21/1982 2142 $19,919 1990
2555 $26,449 1990
141 Generally, with respect to each WO there are many
revisions, adjustments, etc. These changes generally affected
the amount authorized. Additionally, the changes were made on
various dates. The amount authorized shown in our table is the
amount authorized on the last change/revision in the record.
Additionally, the date authorized listed in the table is taken
from the last change or revision and lists only the year
authorized since the WO’s and ER’s contain numerous signature
lines and dates signed.
Page: Previous 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 NextLast modified: May 25, 2011